For builders, architects & designers

Plan the technology before the walls close.

We work with builders, developers, architects and designers to bring low-voltage, lighting control, audio-video and security into the project at the right stage.

Architecture and connected-home planning
Architecture and connected-home planning · illustrative space reference

Who we work with

A technology partner for the whole build.

Builders & developers

Plan connected-home infrastructure early, so it arrives on schedule and inside the scope.

  • Low-voltage scope written against your drawings
  • Work scheduled around your trades and site milestones
  • One contact for AV, network, lighting control, security and shades
  • Model homes and multi-unit projects
  • Pre-wire packages buyers can upgrade later
  • Homeowner handover at move-in
Network and equipment infrastructure planning
Network and equipment infrastructure planning · illustrative space reference

Where we fit in your schedule

Six stages, from drawings to handover.

Select a stage to see what Texotec handles and what we need from the project team.

What Texotec does

  • Review drawings and the client’s goals
  • Mark TV, speaker, keypad, camera and access-point locations
  • Size the equipment room or rack location
  • Written low-voltage scope and responsibilities

What we need from you

  • Current floor plans and elevations
  • Electrical and lighting plans
  • Client brief or wish list
  • Project schedule

Planning resources

A planning pack for your team.

Low-voltage planning checklistEvery location to decide before rough-in: TVs, speakers, keypads, cameras, access points and the rack.
Rough-in guideBox heights, conduit, cable types and labelling, so the site team and electrician know what to expect.
Finish and placement optionsKeypad finishes, speaker grilles and display mounting options to review with the client.

Our work

Projects with builders and designers.

Ask about examples relevant to your property. Completed-project photographs are shared only where approved.

Discuss project examples →

Questions

Common questions from project teams.

When should Texotec be brought into a project?

At design development, while drawings can still change. The latest practical point is before rough-in; after drywall, options narrow and costs rise.

Do you work with our electrician?

Yes. We coordinate box locations, heights and power requirements with the electrician and confirm who supplies and installs what in the written scope.

Can you provide pricing for multiple units or a model home?

Yes. Share the drawings and unit mix and we’ll prepare a scope for the model home and standard and upgrade options for buyers.

Do you deal with homeowners directly?

Only as agreed with you. Some builders want us to handle upgrade selections and handover with buyers; others prefer to manage that themselves.

Let’s discuss what fits your project.

Share your location, goals and any equipment already in place. We’ll confirm what’s possible and what we need to know.

Scroll to Top
Plan your project

What are you planning?

Three quick choices. Our team will help you compare suitable options.

Skip to the enquiry form →